651 B
651 B
Next Steps
Story Manager Handoff
Reference this architecture for Visual Editor implementation. Key integration requirements:
- Preserve existing Directus collections
- Maintain Task Master compatibility
- Follow Visual Editor best practices
- Ensure mobile responsiveness
Developer Handoff
Implementation should:
- Start with read-only POC
- Add Visual Editor incrementally
- Maintain existing system integrity
- Follow security guidelines
- Optimize for performance
This brownfield architecture provides a low-risk, high-value enhancement to the existing task management ecosystem while building foundation for future PM/KB evolution.