17 lines
691 B
Markdown
17 lines
691 B
Markdown
# Infrastructure and Deployment Integration
|
|
|
|
## Existing Infrastructure
|
|
**Current:** Directus at enias.zeabur.app with production database
|
|
**Tools:** Zeabur platform, 164+ MCP tools operational
|
|
**Environment:** Production instance with established collections
|
|
|
|
## Enhancement Deployment Strategy
|
|
**Approach:** Zero-downtime static site deployment
|
|
**Infrastructure Changes:** None - leverages existing completely
|
|
**Pipeline:** Simple static site deployment to Netlify/Vercel
|
|
|
|
## Rollback Strategy
|
|
**Method:** Static site reversion - instant rollback
|
|
**Risk Mitigation:** All changes additive, existing functionality preserved
|
|
**Monitoring:** Leverage existing Directus monitoring
|